Booth Lighting Packing List: Fixtures, Cables, Mounts and Spares

Trade Show Booth Lighting Checklist: What to Bring to Every Show

Build the packing list from the complete arrangement you have trialled, the exact equipment variants and the current exhibitor service manual. A list based only on booth size can miss a driver, connector or mounting part. Assign each item a quantity, case location and person responsible for checking it.

1. Confirm the service before counting equipment

  • Save the electrical order, approved outlet positions, supply details and installation contact.
  • Confirm what the venue or contractor supplies and what you must bring, including distribution equipment and any access equipment.
  • Record the actual order and document deadlines from this event's manual; do not rely on a general price or a fixed number of weeks.

2. Pack the tested lights and compatible spares

  • List every fixture by model, variant, position and chosen colour setting. Select quantities from the display trial, not a lamp-per-foot rule.
  • Choose spares according to the importance of each display zone, replacement lead time and available space. Check the spare's connections and mounting.
  • Bring replacement light sources only if the model permits user replacement. Do not treat integrated LEDs as interchangeable bulbs.

3. Account for the whole power path

  • Pack the exact power cords, compatible link cables and any required drivers, with labels matching the layout.
  • Confirm that extension and distribution equipment is permitted and correctly rated for the supply, length and total load. Use the lowest applicable component, circuit and venue limit.
  • Check voltage, frequency and required grounding. A plug adaptor does not change voltage or frequency and must not interrupt required grounding.
  • Include approved cable supports and any permitted crossing protection. Tape alone is not a substitute for the required cable protection.

4. Check mounts, small parts and permitted tools

  • Pack compatible clamps, sliders or brackets, specified fasteners and any required retention parts. Count the complete attachment set for each fixture.
  • Bring the tools required by the mounting instructions only where your team is allowed to do the work. Arrange contractor support and suitable access equipment where needed.
  • Test any permitted temporary adhesive on the actual surface; do not assume it leaves no residue or provides structural support.

For example, the current 25W fixed-CCT arm light listing includes a 3m power cord, a 1m link cable and an aluminium clamp with the fixture. Reconcile the received kit and order variant with your layout. Those lengths or that clamp may not fit your installation, and other models have different contents.

5. Carry the relevant records

  • Keep the layout, model instructions, required product documentation, order confirmations and service contacts accessible offline.
  • Ask which marking and documents the destination and event require for the exact model and variant. CE marking is a manufacturer's conformity declaration, not an EU authority's safety approval; do not treat it as interchangeable with a required UL or ETL listing.
  • Keep batteries, if any, on a separate list and check the actual carrier and venue rules before travel or use.

6. Inspect, pack and check again on arrival

Disconnect power before handling connections or packing. Check housings, mounts, connectors and cable insulation; set damaged items aside for qualified assessment. Use the model's permitted packing position, protect components from movement and label each case. Rehearse assembly using only the packed contents, check readability and reflections, and confirm the required cooling clearances. Photograph the tested arrangement. On arrival, check inventory and damage again, then have the authorised installer confirm the completed setup before normal operation. If a protective device trips, investigate the cause with electrical service rather than repeatedly resetting it.

After each show, record missing parts, damaged items and changes to the next layout. Update the quantities before closing the cases; a packing list works best as a checked inventory of your actual system.