Coordinate lighting with the booth structure, graphics, power and installation team before ordering. For an exhibit builder, the useful result is a documented assembly that can be installed, checked and reused under the next event's conditions. Lighting alone cannot guarantee visitor numbers, leads or return on investment.
Put the lighting tasks on the construction drawing
Mark the message seen from the aisle, product inspection areas and working surfaces. Record target dimensions, mounting positions, distances and visitor viewing directions. Specify the actual frame section, fixing interface, supported load and service access. Include cable routes and clearances so fabric, graphics and other fittings do not obstruct the light or required ventilation.
Select complete assemblies
For arm lights, match mounts and light distribution to the measured surfaces. For strips, specify the exact length, profile, power supply, connectors and mounting method; input consumption is not automatically minimal. For a backlit graphic, coordinate modules, spacing, frame depth and graphic material as one system. LEDs and power supplies still produce heat: verify suitability for the enclosure and follow the manufacturer's mounting and clearance instructions.
Approve a representative trial
Build one relevant wall or shelf section with the real graphic and products. Record the fixture model, optics, available CCT setting and any supported controls. Kelvin or CRI 90+ alone does not guarantee a brand-color match. Check readable text, coverage, shadows, reflections and glare from the intended standing and seated positions. Agree the acceptance conditions with the client and repeat the check under hall lighting after installation.
Prepare the electrical and service schedule
List the actual input loads of lights, power supplies, screens and other equipment without counting the same load twice. Give the event's electrical provider the equipment data and planned connection locations. Confirm supply, permitted circuits, cable and connector limits, startup requirements, linking limits and required installer work. A blanket 5–20A assumption or a 20% allowance cannot establish compliance. The Freeman exhibitor guide illustrates separate service orders and deadlines; use the current manual for your own event.
Hand over the installation record
Pack labelled assemblies, a parts list, tested compatible spares and setup instructions. After transport, inspect mounts, cables and connectors before use. Give the client the final drawing, cable diagram, fixture settings, photographs, operating instructions and permitted replacement parts. Record who handles faults or changes; electrical repairs belong with appropriately qualified personnel. For model selection, compare booth lighting and send BOOTH LIGHTS the construction details.