Trade Show Lighting: A Project Handover Checklist for Stand Builders

Trade Show Lighting: A Project Handover Checklist for Stand Builders

For a reusable exhibition stand, choose lighting as part of the complete build and document the approved configuration. The handover should tell the installation team what to mount, where to aim it and which electrical limits apply. Stand area alone does not determine fixture quantity.

Prepare one lighting brief for the project

Record graphic and product dimensions, mounting height, frame profiles, visitor viewing positions, supply details and the destination venue. Identify the surfaces that need front lighting and any panels that need internal backlighting. Obtain the organizer's mounting and electrical requirements before final approval.

Choose the system for the surface

Arm lights can illuminate graphics and products when their brackets fit the structure and their beam covers the target. Lightbox strips and rigid modules need a layout matched to panel depth, optics and diffuser. Check a sample of the actual panel rather than assuming every COB strip produces a uniform finished display. Compare lumen output, beam angle, CCT and color-rendering data for the exact model.

Document mounting and electrical limits

Record clamp opening, frame fit, permitted loads and fastening instructions. List each fixture, power supply, cable and controller by model. Match voltage, polarity and connectors; check total load, cable ratings and maximum linked quantity separately. Low-voltage systems still require cable-length and feed-point planning because voltage drop can occur.

Verify documents before shipping

Use certification and conformity documents that match the delivered model and destination, then confirm venue acceptance. The OSHA NRTL program explains recognized laboratory certification for relevant US applications. A product-page logo does not verify the whole build. Confirm the intended environment of fixtures, cables and supplies; an IP number alone is not approval for outdoor use.

Test and hand over the actual layout

  1. Assemble the planned equipment with representative graphics and products.
  2. Check coverage, glare, reflections, shadows and color from visitor positions.
  3. Check secure mounts and compliant cable routing, then adjust quantity from the tested coverage.
  4. Photograph and label the approved layout; include the parts list, connection limits and relevant documents with the equipment.

Repeat the visual check under venue lighting after installation. Record substitutions and changed positions so the next crew does not inherit an undocumented configuration.

Compare LED display arm lights. For a project review, send BOOTH LIGHTS the lighting brief, frame photos and installation date.